How To Operation High frequency Machine

By Echo HuYongJia Machinery
Wed, 19 Mar 2014 08:00:00 GMT

1 first connected three-phase power switch, then open the machine side power switch on the control box, if there is high cycle switch, do not play, then play on the electric power switch, the vacuum tube and the heat began to die preheating.

2 in the lower die on the auxiliary insulation, installed on the extreme mode, press the mode switch to start debugging on the lower die bonding position, if the next bonding bad mobile die, if it is not level, four pillars of the upper die.

3 die after a good tune, adjust the three time controller (if it is a pedal type machine, only a high cycle welding time, fall time) that is running on the mold to mold pressing time, welding time output time, cooling time, the curing time, the three time applications require flexible, no fixed value the number of.

4. if the first mode is adjusted, the spacing of the coherency tuning tune should be adjusted to the widest possible range.

5. more than 10-15 minutes of operation, and when the temperature has reached the required time, turn on the high cycle switch, start the operation test.

6. test, if the effect is not ideal, you need to slowly add to the coherence device, watch the screen flow table (different models, the value of the table is different, please refer to the manual). Check the product. If it is not ideal, add a little or less of the connector until you reach the requirement.

7. the effect of the finished product is determined by the following four aspects:

Temperature, coherence, power output, pressure, output, high cycle time. Above four aspects, please adjust flexibly.